Segundo asiento central hidroeléctrica Jinping en Sichuan Liangshan Yi Prefectura Autónoma Muli, Yanyuan en el Yalong, en el cruce de tres condados Mianning Jinping Great Bend, karaoke system to the Yalong River estuary five development Step Power station. Jinping hydropower utilization Yalong Bay 150km Jinping large natural gap, straighter tunnel excavation of diversion and power generation. Jinping dam located downstream of 7.5km at a plant located in the eastern end of a large bay big ditch. Normalmente, the reservoir 1646m, backwater length of 7.5km, corresponding storage capacity is 14.01 million m3, reservoirs dead water level 1640m, fixed capacity of 9.05 million m3, regulating capacity of only 4.96 million m3. Wan power plant total installed capacity of 8x60 kW, for many years the average annual generating capacity of 24.23 billion kW · h. Header set low gate, gate access to the basin area of 103 000 km2, gate site at annual average flow 1220m3 / s. Reservoir has daily regulation functio
404. That’s an error.
The requested URL /translate_a/t
was not found on this server. That’s all we know.
ics.
Jinping Hydropower Station were arranged eight penstocks, penstock pipe sections each average about 175. Pipe maximum diameter 6.5m, the minimum diameter of 6.05m, the maximum length of a single axis of 3m, a single minimum axial length of 1.296m. 8 penstock in the direction toward the upstream segment 28.8m from the plant upstream side wall at 2.38m (penstock end), the use of 600MPa high-strength steel. The inner diameter of the pipe section is 6.05m, 6.5m and 6.05m ~ 6.5m gradient of the cone, its thickness, respectively 56ram, 52mm, 48mm, 44mm, 40mm. The remaining segments are used 16MnR 500MPa grade pressure vessel steel, the main part of the high-pressure pipeline including flat section, the curved section, the shaft section, recurved segment and a lower flat section, the inner diameter of the steel pipe are 6.5m, steel plate thickness of 20mm, respectivamente, 22ram, 24mm, 28ram, 36ram,mm8mm, single pipe length of 447m ~ 490m.
404. That’s an error.
The requested URL /translate_a/t
was not found on this server. That’s all we know.
eel.
My unit construction of most of the pressure pipe manufacture, wherein the sheet 38ram below,
404. That’s an error.
The requested URL 404. That’s an error.
The requested URL /translate_a/t
was not found on this server. That’s all we know.
/translate_a/t
was not found on this server. That’s all we know.
404. That’s an error.
The requested URL /translate_a/t
was not found on this server. That’s all we know.
,biseladora does not walk on the sheet, the sheet processing blunt edge sample sizes and other issues affecting the penstock production efficiency, delay the construction period. How safe, eficiente, and shelf life of the penstock plate processing,
404. That’s an error.
The requested URL /translate_a/t
was not found on this server. That’s all we know.
.
2.
404. That’s an error.
The requested URL /translate_a/t
was not found on this server. That’s all we know.
Manshuiwan steel from the transfer station to the factory ship, there should be full-time personnel hoisting steel, industrial pipe portion, Ann prime rings, maintenance personnel should be the Ministry of plate thickness, tipo, tamaño, peso, arrival time, make a record and acceptance. Lifting operations should pay attention to the signal, commanding officers and the driver to concentrate on operating, preciso, 10cm ~ 30cm, smooth and rope force to check whether an object even after lifting the load off the ground, the brake mechanism is safe and reliable; lifting member when the angle between the wire rope should be less than 60. And to ensure that the choice of wire rope safety factor of more than 8 veces; according to the type of material, the thickness of the stacked classification and woods support pad, the pad off the ground, the upper awning material should be added to prevent corrosion, contamination and deformation. Press the assembly sequence, the sheet transport by truck to the CNC cutting machine platform, records indicate good plate number NC increases the drawing sheet model corresponding (Technical Department prepared after the copy to the CNC cutting machine), according to the drawing on the plate rehearse, corte. Groove preparation is an important step and it requires penstock longitudinal seam, girth were "X" slope processing, in order to step slope butt welding, th
404. That’s an error.
The requested URL /translate_a/t
was not found on this server. That’s all we know.
Preparation groove construction: 1
404. That’s an error.
The requested URL 404. That’s an error.
The requested URL /translate_a/t
was not found on this server. That’s all we know.
/translate_a/t
was not found on this server. That’s all we know.
404. That’s an error.
The requested URL /translate_a/t
was not found on this server. That’s all we know.
nt rusting.
Utilizar
404. That’s an error.
The requested URL /translate_a/t
was not found on this server. That’s all we know.
404. That’s an error.
The requested URL /translate_a/t
was not found on this server. That’s all we know.
l.
- Noticias
- Noticias de la Industria
- Feria